Two buildings providing 20,000m2 of office and retail space constructed above the existing underground car parking levels. The project, which was completed mid 2008 required very challenging air permeability targets.
The buildings geometry, its steel frame and a myriad of different envelope systems presented enormous challenges in achieving the targets. The new buildings also communicated with and included parts of the existing core structures at the lower levels with entrances to the office demise passing through retail areas on the lower levels.
RETAIL
-
-
Project Name: LIDL Location: Kilcock Co Kildare Architects: Structural Design Solutions Completion Date: February 2013
-
Project Name: Primary Care Facility Location: Newbridge Co Kildare Client: Kildare VEC/HSE Architects: McCarthy O’Hora Architects Engineers: Dermot O’Keeffe & Associates QS: KSN Completion Date: 2013